Q1. Country:
Bosna and Hercegovina
Q2. Partner name:
Hydro-Engineering Institut of Sarajevo Faculty of Civil Engineering
Q3. PARTNER – Final Beneficiary No.:
FB 12
Q4. Reporting country (1) (cross-border country (1) )
Bosna and Hercegovina
Q5. Reporting country (2) (cross-border country (2) )
Croatia
Q6. Estimated number of CBWSS (active)(Number and name of the CBWSS):
Regional Water Supply System “Josip Jović”
Q7. Estimated number of CBWSS (inactive – ceased to operate)(Number and name of the CBWSS):
0
Q8. Potential development of CBWSS(Number and name of the CBWSS):
0
Q1. Country name:
Bosna and Hercegovina
Q2. Partner name:
Hydro-Engineering Institut of Sarajevo Faculty of Civil Engineering
Q3. Partner – Final Beneficiary No.:
FB 12
Q4. Between country – water coming from (origin country (1)) and
Bosna and Hercegovina
Q5. Country (2) – water supplied to (delivered):
Croatia
Q6. Water supply system name (English):
Regional Water Supply System “Josip Jović”
Q7. Water supply system name (Country 1):
Regionalni vodovodni sustav “Josip Jović”
Q8. Water supply system name (Country 2):
Regionalni vodovodni sustav “Josip Jović”
Q9. Date/year established cross-border water supply:
2001.
Q10. Management of origin side of the WSS:
Vodogradnja d.o.o. Tomislavgrad (vodogradnja@tel.net.ba)
Q11. Management of delivery side of the WSS:
Vodovod Imotske krajine d.o.o. Imotski
Q12. Amount of water supplied (as per contract/agreement):
50 l/s, 500.000 m3/year
Q13. General nature of the CBWS – emergency water supply, peak water supply, permanent water supply:
Water delivery is according to contract. Ceoncession is being signed. Amount of water that can be delivered is up to 50l/s, currently is being delivered 3l/s.
Q14. Existing legal framework for the CBWS:
Yes, delivery of water is defined with contract. Currently they are waiting for cencession.
Q15. Top level CBWS management body (if mutually defined):
/
Q16. Origin country reference body for the management body:
Agencija za vodno područja Jadranskog mora
Q17. Delivery country reference body for the CBWS management body.
Ministry of Foreign Affairs.
Q18. Legal framework management – Contract party meetings (annual, even more frequent):
Yes, there is signed contract for water supply.
Q19. Issues addressed on the local level:
Not for now. Currently is being delivered 3l/s but in contract it is defined that it can be delivered up to 50 l/s.
Q20. Issues addressed on the regional level:
Not for now. Currently is being delivered 3l/s but in contract it is defined that it can be delivered up to 50 l/s.
Q21. Issues addressed on the state level:
/
Q22. Legal option to increase maximum annual entitlement?
/
Q23. Minimum amount of water delivery defined?
/
Q24. Which is the body assigned by the contract for the resolution of disputes?
/
Q25. Ownership of the cross-border infrastructure:
Vodogradnja Tomislavgrad, vodovod Imotske krajine
Q26. Are the water rights on the water resource assigned to the cross-border partner? In which way?
/
Q27. Termination of the water delivery of contract
/
Q28 Minimal water consumption legally defined?
Yes, 50l/s.
Q29. Is the legal heritage of the systems resolved
Water supply system was built after war.
Q30. Is the water price(charge) composed by different components?
/
Q31. How is the pricing mechanism defined (water charges):
/
Q32. Are the minimal charges foreseen? – Fixed charges, full for empty:
/
Q33. Is the non-payment procedure regulated by the contract?
/
Q34. Is there a special tariff (surcharge) for the excessive water supply?
/
Q35. Insurance cost covered – insurance cost tariff, insurance model foreseen by the contract:
/
Q36. Depreciaton of the infrastructure, investment/maintenance plans agreed ? (amortizacija, ammortamento):
/
Q37. Penalties for unfulfilment of contractual obligations?
/
Q38. Is the mutual inspection of records/book-keeping established? (due dilligence approach):
/
Q39. General assessment of the CBWS economics :
/
Q40. Payment statistics for the last 5 years:
/
Q41. Other:
/
Q42. Measurement of water delivered:
/
Q43. Is continuity of water supply – intermittent water supply an issue?
/
Q44. Agreed water quality issues:
/
Q45. Water quality monitoring jointly controlled/verified:
/
Q46. Temperature regulated by the contract?
/
Q47. Pressure regulated by the contract?
/
Q48. Cross – border profile management:
/
Q49. Construction of project facilities:
/
Q50. Is the daily dynamics of water demand/supply an issue ?
/
Q51. Is the seasonal dynamics of water demand/supply an issue ?
/
Q52. Management of water losses – are water losses in the supply, uptake side an issue?
/
Q53. Is the water availability/demand an issue on supply country or demand country side?
/
Q54. Transitional phenomena an issue?
/
Q55. Other technical issues?
/
Q56. Long term planning mechanisms established?
/
Q57. LIASON OFFICERS DETERMINED? Communication process determined and functioning?
/
Q58. Joint supervision of the Water Supply System?
/
Q59. Joint management of the water resource?
/
Q60. Contingency plans existing?
/
Q61. Main problems identified:
/
Q62. Other comments:
/
Q63. Vision:
/
Q64. Do you consider that the legal framework for the CB WSS is adequate, or under-defined:
/
Q65. Do you consider that the economic framework for the CB WS is adequate, or under-defined:
/
Q66. Do you consider that the technical framework for the CB WS is adequate, or under-defined:
/
Q67. How would you assess general perception of the cross border water supply in public?
/
Q68. Provide in the attachment shp file of the existing water supply network:
/
Q69. Provide documents on general state-level framework for the cross-border water supply:
/
Q70. Specific delivery contract:
/
Q71. Regulations, technical documentation:
/
Q72. Statistics on the water supplied and payments provided for the last five years:
/
Q1. Country name:
Bosna and Hercegovina
Q2. Partner name:
Hydro-Engineering Institut of Sarajevo Faculty of Civil Engineering
Q3. Partner – Final Beneficiary No.:
FB 12
Q4. Between country – water coming from (origin) and:
/
Q5. Country (2) – water supplied to (delivered):
/
Q6. Water supply system name (English):
/
Q7. Water supply system name (Country 1):
/
Q8. Water supply system name (Country 2):
/
Q9. Management of origin side of the WSS:
/
Q10. Management of delivery side of the WSS:
/
Q11. Amount of water supplied (as per contract/agreement):
/
Q12. General nature of the CBWS – emergency water supply, peak water supply, permanent water supply:
/
Q13. General description of the nature of the necessity:
/
Q14. Status of the preparation of the technical/legal/economics and other documents:
/
Q15. Potential date of construction (estimated if possible):
/
Q16. Describe recognized limitations inhibiting the development of potential CBWSS:
/